At a glance information
- CLIENT NAME : THPropco ARE Ltd (managed by POD Management)
- LOCATION : Ashley Road East, Tottenham Hale, London
- SCHEME TYPE : Residential heat network
- SERVICES : Operations & Maintenance, Optimise
In 2025-26 Switch2 worked closely with THPropco ARE Ltd, managed by POD Management, to improve the performance and reliability of the heat network at Ashley Road East in Tottenham Hale. Using Optimise analytics and targeted maintenance interventions, Switch2 identified underperforming properties, delivered measurable efficiency improvements and provided critical engineering expertise and support during a period of operational challenge. The programme resulted in lower network consumption, improved heat extraction and a more stable service for residents.
Project Overview
Location: Ashley Road East, Tottenham Hale, London
Client: THPropco ARE Ltd (managed by POD Management)
Scheme Type: Residential heat network
Number of Properties: 183 properties
Services Delivered: Operations & Maintenance, Optimise
Key Results
- 24% less water required to deliver 1kWh heat
- 28% less water passing through the network each day
- Return temperatures (VWART) reduced by over 6°C
- 32% improved heat transfer (VWATD)
- £3,340 estimated annual cost savings
Challenge
POD Management wanted to improve heat network performance and continue enhancing service quality for residents at Ashley Road East. Performance analysis identified opportunities to improve network efficiency, while a significant loss of hot water and pressure created an urgent operational challenge requiring investigation and support.
Switch2 Objectives
- Improve overall heat network performance.
- Reduce inefficiencies across the network.
- Identify and address underperforming properties.
- Improve service reliability for residents.
- Provide practical support during service disruptions.
Switch2 Approach
Using Optimise analytics, Switch2 identified nine underperforming properties and carried out targeted maintenance visits to improve overall network performance. This proactive approach enabled the team to address inefficiencies and support long-term improvements across the network.
Switch2’s proactive support extended beyond data analysis. When the site experienced a significant loss of hot water and pressure, the engineering team investigated the issue and identified that the root cause was a failure of the cold-water booster pump rather than an asset maintained by Switch2. Although the booster pump fell outside Switch2’s maintenance responsibility, Switch2 worked closely with the site team to identify a temporary solution and help restore services for residents.
To ensure continuity of service, Switch2 remained on site monitoring the boilers and wider system performance, providing guidance to the site team on how to manage the temporary arrangement until the underlying issue could be permanently resolved. This collaborative approach helped minimise disruption and demonstrated the value of proactive engineering support alongside ongoing maintenance and optimisation services.
Impact Delivered
The targeted maintenance programme delivered measurable improvements in network performance, helping the system operate more efficiently and reduce the volume of water required to deliver heat across the development. These improvements have contributed to lower operating costs, more effective heat extraction and improved overall network performance.
The project also highlighted the value of proactive engineering support and close collaboration between POD Management and Switch2. Although the loss-of-service incident was ultimately traced to a failure within the site’s cold-water system, outside Switch2’s maintenance responsibility, the support provided by the team helped minimise disruption and contributed to a more stable and reliable heating and hot water service for residents. Since the incident, the development has experienced significantly greater service stability, helping improve confidence for both the site team and residents.
Client Testimonial
“Switch2 has played an important role in improving the reliability and stability of the heating and hot water systems at Ashley Road East. During a significant loss-of-service incident in June, the underlying issue was identified as a failure within the cold-water system rather than an asset maintained by Switch2. Despite this falling outside their direct remit, James went above and beyond to help identify the cause, support a temporary workaround and remain on site to ensure that services were restored and operating effectively for residents.
The continued support from the wider Switch2 engineering team, together with strong communication and collaboration with POD, has also helped us identify issues early and implement the necessary remedial actions. Since June, we have experienced a much more stable service, which has made a real difference for both the site team and our residents.”
Sarah Arena, Development Manager, POD Management
Why It Matters
Ashley Road East demonstrates how actionable network data can drive meaningful operational improvements. Through Optimise analytics and targeted maintenance interventions, Switch2 was able to identify inefficiencies, prioritise remedial action and improve overall network performance. Combined with proactive engineering support, this approach has helped create a more efficient, resilient and reliable heat network for both the client and residents.